column
STARTUP AND PARAMETER MEASUREMENTS FOR PAKISTAN MNSR (PARR-Ⅱ)
LAN YIZHENG;SHI YONGQIAN;LI FUMIN;CHEN SHAONENG;LI YIGUO China Institute of Atomic Energy, P.O. Box 275, Beijing
1990, 24(6): 5-5. DOI: 10.7538/yzk.1990.24.06.0005
Abstract PDF
MEASUREMENT OF THE EFFECTIVENESS OF THE CONTROL ROD AND REFLECTORS OF THE PROTOTYPE MNSR
ZHENG WUQIN;YANG XIUMIN China Institute of Atomic Energy, P. O. Box 275, Beijing
1990, 24(6): 16-16. DOI: 10.7538/yzk.1990.24.06.0016
Abstract PDF
THE SAFETY STUDY OF THE MNSR
ZHU GUOSHENG China Institute of Atomic Energy, P. O. Box 275, Beijing
1990, 24(6): 23-23. DOI: 10.7538/yzk.1990.24.06.0023
Abstract PDF
5 MW EXPERIMENTAL LOW TEMPERATURE NUCLEAR HEATING REACTOR AND ITS SAFETY FEATURES
ZHENG WENXIANG;DONG DUO Institute of Nuclear Energy, Technology Tsinghua University, Beijing
1990, 24(6): 30-30. DOI: 10.7538/yzk.1990.24.06.0030
Abstract PDF
THE EXPERIMENTAL STUDY OF THE OPERATION FEATURE AT TSINGHUA 5 MW TEST HEATING REACTOR
ZHANG DAFANG;GAO ZUYING;SU QINGSHAN Institute of Nuclear Energy Technology, Tsinghua University, Beijing
1990, 24(6): 37-37. DOI: 10.7538/yzk.1990.24.06.0037
Abstract PDF
THE POSSIBILITY RESEARCH ON LOCAL BOILING STARTUP OF 5 MW LTHR
CHEN XINMIN;GAO ZUYIN Division 103, Institute of Nuclear Energy and Technology, Tsinghua University, Beijing
1990, 24(6): 46-46. DOI: 10.7538/yzk.1990.24.06.0046
Abstract PDF
THE PRELIMINARY TRANSIENT ANALYSES FOR 10 MW HTR--MODULE TEST REACTOR
GAO ZUYING;WANG YANSHENG Institute of Nuclear Energy Technology, Tsinghua university, Beijing
1990, 24(6): 53-53. DOI: 10.7538/yzk.1990.24.06.0053
Abstract PDF
THE DISCHARGE TEST OF THE BATTERY PACKAGE IN HWRR
XIA YANLING;LU SHIQI;LIU ZHIQING;ZHANG GUANGJI China Institute of Atomic Energy, P. O. Box 275-2, Beijing
1990, 24(6): 62-62. DOI: 10.7538/yzk.1990.24.06.0062
Abstract PDF
SOME ANALYSIS OF POSTULATED ACCIDENT FOR 49-2 SWIMMING POOL REACTOR
WANG YONGQING;CU SHAOCHU;WANG LIUGUI;ZHANG ZENGQING China Institute of Atomic Energy, P. O. Box 275--54, Beijing
1990, 24(6): 68-68. DOI: 10.7538/yzk.1990.24.06.0068
Abstract PDF
THE DESIGN OF CONTROL ALGORITHM FOR AUTOMATIC START-UP MODEL OF HWRR
GUO WENQI China Institute of Atomic Energy, P. O. Box 275, Beijing
1990, 24(6): 73-73. DOI: 10.7538/yzk.1990.24.06.0073
Abstract PDF
DETERMINATION OF NEUTRON TEMPERATURE AND EPITHERMAL INDEX IN THE IRRADIATON SITES OF MNSR
CHEN SHAONENG;LI DEJIANG China Institute of Atomic Energy, P. O. Box 275-75, Beijing
1990, 24(6): 78-78. DOI: 10.7538/yzk.1990.24.06.0078
Abstract PDF
REVIEW AND INSPECTION OF NUCLEAR SAFETY FOR MNSR
LUO CAISHENG;CHENG ZHIQI;TU ZHUGUO Beijing Review Centre of Nuclear Safety, P. O. Box 840
1990, 24(6): 81-81. DOI: 10.7538/yzk.1990.24.06.0081
Abstract PDF
SURVEILLANCE INSPECTION AND RESULT ON PHYSICAL START-UP FOR 5MW EXPERIMENTAL LOW TEMPERATURE DISTRICT HEATING STATION
WANG ZIQING;TU ZHUGUO Beijing Review Centre of Nuclear Safety
1990, 24(6): 85-85. DOI: 10.7538/yzk.1990.24.06.0085
Abstract PDF