LU Bu liang, YE Chang yuan (Quality Assure Department, Ling'ao Nuclear Power Company Limited, Shenzhen 518124, China). Quality Control of Ling'ao Nuclear Power Station Civil Construction[J]. Atomic Energy Science and Technology, 2001, 35(6): 561-561. DOI: 10.7538/yzk.2001.35.06.0561
Citation: LU Bu liang, YE Chang yuan (Quality Assure Department, Ling'ao Nuclear Power Company Limited, Shenzhen 518124, China). Quality Control of Ling'ao Nuclear Power Station Civil Construction[J]. Atomic Energy Science and Technology, 2001, 35(6): 561-561. DOI: 10.7538/yzk.2001.35.06.0561
  • Based on the quality control model adopted during Ling'ao Nuclear Power Station construction, the paper briefly introduces quality control process of some main civil construction activities (reinforced concrete, steel liner, steel works and prestressing force) of nuclear power station, and makes some descriptions on non conformance control of civil works. These quality control processes described in this paper come from the concrete practice during civil construction of Ling'ao Nuclear Power Station, and are based on Daya Bay Nuclear Power Station construction experience.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return