YANG Bing-fan, QIN Jiu-chang, ZHANG Gui-lian, SU Sheng-yong,HUANG Qing-hua, HU Yue-ming, GUAN Xia-ling, YANG Zhi-ren, YANG Tao,KAN Chao-xin, FAN Hong-sheng, PENG Zhao-hua, WEI Yong-xue,ZHANG Qiu-hong, FANG Yu-qing, XIA Qing-liang, LIU De-zhong,YANG Bao-jun, HOU De-yi, MENG. Up-grading of Accelerating Tube on HI-13 Tandem Accelerator[J]. Atomic Energy Science and Technology, 2003, 37(6): 513-513. DOI: 10.7538/yzk.2003.37.06.0513
Citation: YANG Bing-fan, QIN Jiu-chang, ZHANG Gui-lian, SU Sheng-yong,HUANG Qing-hua, HU Yue-ming, GUAN Xia-ling, YANG Zhi-ren, YANG Tao,KAN Chao-xin, FAN Hong-sheng, PENG Zhao-hua, WEI Yong-xue,ZHANG Qiu-hong, FANG Yu-qing, XIA Qing-liang, LIU De-zhong,YANG Bao-jun, HOU De-yi, MENG. Up-grading of Accelerating Tube on HI-13 Tandem Accelerator[J]. Atomic Energy Science and Technology, 2003, 37(6): 513-513. DOI: 10.7538/yzk.2003.37.06.0513
  • The accelerating tube upgrading on HI13 tandem accelerator at CIAE has been completed. The old 182.9 cm accelerating tubes which have been operated for more than 15 years were replaced by one 243.8 cm tube and seven 223.5 cm tubes. To accommodate the new tubes, the configuration of all elements along the beam axis inside tank was rearranged. The modifications on dead section structure, charging system and resistor dividing system has been made. The idlers for the laddertron charging system were redesigned and manufactured. A new structure of the gridded lens at the entrance of tube No.l and associated power supply and control system was adopted. The terminal voltage of the tandem accelerator is now promoted to 15.07 MV.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return