Trial-manufacture of Cladding Materials of Core Subassemblies in China Experimental Fast Reactor
-
Graphical Abstract
-
Abstract
The paper describes the trial-manufacture and test results of cladding tubes of 316(Ti)S. S. used in fuel subassemblies and control subassemblies of China experimental fast reactor(CEFR). As a result, all the characters achieve the trial requirement. The fundamental characters of the two tubes are researched. The results show that the characters of 316(Ti)S. S. cladding are good and can meet the requirements of CEFR.
-
-