ZHAO Ji-jiu, WAHG Chun-hong, LEI Ge, KONG Xiang-cheng, WANG Xiao-li, LI Gang, YUE Ke-juan, ZHAO Zhuo, LIU Jia, GAO Wen-chun, KONG Deng-ming, MA Mei, LE Qi, WANG Jin-can, XU Guang-lei, CHEN Guang-hui, XU Shi-fu, HUANG Song, XUE Peng, LIU Shu, HUANG Xiang-hao, XU Hui-juan. Control System of Beijing Electron Positron Collider[J]. Atomic Energy Science and Technology, 2009, 43(增刊): 165-171. DOI: 10.7538/yzk.2009.43.suppl.0165
Citation: ZHAO Ji-jiu, WAHG Chun-hong, LEI Ge, KONG Xiang-cheng, WANG Xiao-li, LI Gang, YUE Ke-juan, ZHAO Zhuo, LIU Jia, GAO Wen-chun, KONG Deng-ming, MA Mei, LE Qi, WANG Jin-can, XU Guang-lei, CHEN Guang-hui, XU Shi-fu, HUANG Song, XUE Peng, LIU Shu, HUANG Xiang-hao, XU Hui-juan. Control System of Beijing Electron Positron Collider[J]. Atomic Energy Science and Technology, 2009, 43(增刊): 165-171. DOI: 10.7538/yzk.2009.43.suppl.0165
  • The BEPCⅡ project started in summer of 2001 and has passed the National Acceptance Test in July 2009, which is for upgrading the Beijing Electron Positron Collider to reach a higher luminosity and keep its leading position among the same kind of facilities in the world. The BEPCⅡ control system has been rebuilt which adopted the distribution architecture, and developed with the EPICS (Experimental Physics and Industrial Control System). The BEPCⅡ control system was put into operation in November 2006. Till now it runs well and has reached the design goal. This paper describes the new BEPCⅡ control system.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return