MAO Yu-long, CHENG Yan-hua, CUI Da-wei, ZHAO Chang-you, CHEN Jun. DNBR Margin Analysis for Uncontrolled Withdrawal of Rod Cluster Control Assembly Bank From Subcritical or Low Power Startup Condition[J]. Atomic Energy Science and Technology, 2014, 48(8): 1454-1457. DOI: 10.7538/yzk.2014.48.08.1454
Citation: MAO Yu-long, CHENG Yan-hua, CUI Da-wei, ZHAO Chang-you, CHEN Jun. DNBR Margin Analysis for Uncontrolled Withdrawal of Rod Cluster Control Assembly Bank From Subcritical or Low Power Startup Condition[J]. Atomic Energy Science and Technology, 2014, 48(8): 1454-1457. DOI: 10.7538/yzk.2014.48.08.1454

DNBR Margin Analysis for Uncontrolled Withdrawal of Rod Cluster Control Assembly Bank From Subcritical or Low Power Startup Condition

  • Uncontrolled withdrawal of rod cluster control assembly bank from a subcritical or low power startup condition is classified as a RCC-P condition Ⅱ event and always one of the most limiting events in the safety analysis for the nuclear power plant. Based on typical three-loop PWR, the effects of different initial arrangements of the shutdown banks at the hot-shutdown state on the DNBR margin were studied. The results show that the DNBR margin is further increased by optimizing the initial arrangements of the shutdown banks at the hot-shutdown state in order to assure the enough shutdown margins.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return