XU Xiao-zhen. Confirmation of Configuration Item and Configuration Baseline in Nuclear Power Plant Design[J]. Atomic Energy Science and Technology, 2014, 48(增刊2): 850-853. DOI: 10.7538/yzk.2014.48.S1.0850
Citation:
XU Xiao-zhen. Confirmation of Configuration Item and Configuration Baseline in Nuclear Power Plant Design[J]. Atomic Energy Science and Technology, 2014, 48(增刊2): 850-853. DOI: 10.7538/yzk.2014.48.S1.0850
XU Xiao-zhen. Confirmation of Configuration Item and Configuration Baseline in Nuclear Power Plant Design[J]. Atomic Energy Science and Technology, 2014, 48(增刊2): 850-853. DOI: 10.7538/yzk.2014.48.S1.0850
Citation:
XU Xiao-zhen. Confirmation of Configuration Item and Configuration Baseline in Nuclear Power Plant Design[J]. Atomic Energy Science and Technology, 2014, 48(增刊2): 850-853. DOI: 10.7538/yzk.2014.48.S1.0850
Confirmation of Configuration Item and Configuration Baseline in Nuclear Power Plant Design
Design change can be reduced and cost of project can be controlled by using configuration management (CM). In this paper, the confirmations of the configuration item and the configuration baseline were discussed in detail. And a good foundation is built for the utility of CM.