LI Fei, LAI Hou-jing, ZHANG Guo-qing, ZHANG Li-ming, SHI Wei-li. Research for RPN Intermediate Range Current Range Switch Problem[J]. Atomic Energy Science and Technology, 2014, 48(增刊2): 1068-1072. DOI: 10.7538/yzk.2014.48.S1.1068
Citation: LI Fei, LAI Hou-jing, ZHANG Guo-qing, ZHANG Li-ming, SHI Wei-li. Research for RPN Intermediate Range Current Range Switch Problem[J]. Atomic Energy Science and Technology, 2014, 48(增刊2): 1068-1072. DOI: 10.7538/yzk.2014.48.S1.1068

Research for RPN Intermediate Range Current Range Switch Problem

  • One software solution was presented to solve the unexpected reactor trip problem, which was caused by peak current generated during current range switch of intermediate range of nuclear instrument system (RPN). A lot of tests were performed in factory and on site. The results show that the peak current can be avoided effectively using this software solution, the current range can be switched smoothly and the system stability is improved significantly. Furthermore, this software solution was applied in many nuclear power plants, a stable output can be achieved by intermediate range at different core status, and consequently the economic loss caused by unexpected reactor trip can be avoided.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return