DU Dong-xiao, HE Jie, ZHANG Qin-fang, CAI Yi-lin, YU Wen-ge, YANG Xing-wang. Risk-informed In-service Inspection Methodology Study and Application in Nuclear Power Plant[J]. Atomic Energy Science and Technology, 2017, 51(4): 676-683. DOI: 10.7538/yzk.2017.51.04.0676
Citation: DU Dong-xiao, HE Jie, ZHANG Qin-fang, CAI Yi-lin, YU Wen-ge, YANG Xing-wang. Risk-informed In-service Inspection Methodology Study and Application in Nuclear Power Plant[J]. Atomic Energy Science and Technology, 2017, 51(4): 676-683. DOI: 10.7538/yzk.2017.51.04.0676

Risk-informed In-service Inspection Methodology Study and Application in Nuclear Power Plant

  • The methodology study of risk-informed in service inspection (RI-ISI) was presented in the paper. In the RI-ISI process, the risk insights were incorporated, and the risk matrix was employed to characterize the safety significance in two-dimension (i.e. rupture likelihood and consequences of assumed pipe ruptures). The inspection effectiveness and pertinence could be improved. The RI-ISI method was applied to pipes in primary circuit pressure boundary of unit 1 and 2 for Tianwan Power Plant. The evaluation results show that RI-ISI allows the plant to target its resources to inspection locations which are truly significant risk, and the in-service inspection workload and cost decrease. In addition, the irradiation doses to workers with in-service inspection programs can be keeping as low as reasonably achievable. Some suggestions on RI-ISI application were proposed in the end.
  • loading

Catalog

    Turn off MathJax
    Article Contents

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return