用ICARE2程序模拟秦山核电厂熔渣床的形成

Simulation of In-vessel Debris Formation in Qinshan Nuclear Power Plant Using ICARE2 Code

  • 摘要: 以小破口失水加全厂断电事故为例,用ICARE2V3mod1.3程序分析严重事故早期压力壳内堆芯的破坏以及熔渣床的形成过程。分析结果表明:堆芯部件从4832s开始损坏后逐渐形成熔渣,并可清晰显示熔渣床的形成过程;在事故发生10000s后,总共形成约30000kg固态熔渣和10000kg液态熔渣。由于堆芯的冷却条件差,使得整个堆芯的损坏进程很快。

     

    Abstract: The simulation of formation of debris bed from degraded fuel rods is performed in an accident sequence of SBLOCA with station blackout for Qinshan nuclear power plant using ICARE2 V3mod1.3. The calculation results show that the core starts to degrade from 4 832 s and the related formation of debris bed is simulated until (10 000 s) when 30 000 kg solid debris and 10 000 kg liquid debris are produced. The (analysis) shows that the whole progress of core degradation is relatively fast due to poor core cooling conditions.

     

/