Abstract:
Based on the preliminary parameters of fusion reactor, the calculation model with 20° range was built for the solid blanket including the first wall armor, the first wall cooling plate, the tritium breeding region and the support structure. Li
4SiO
4 and Li
2O were adopted as tritium breeder material, respectively. By using code MCNP, the influence of structure and
6Li enrichment on tritium breeding ratio was studied. The results show that
6Li enrichment in the range of 30% to 80% is suitable, the beryllium armor of first wall leads to increase of the tritium breeding ratio, and the thickness of first wall cooling plate should not exceed 3 cm to avoid negative effect on tritium production.