Abstract:
As a national big scientific engineering, Shanghai Synchrotron Radiation Facility (SSRF) has rigid requirement to the components with sub-millimeter accuracy. In the process of survey and positioning global control network is a connecting link, which determines the position relationship between building and accelerator devices, and provides high accuracy datum to local control network. Within the designing process, building and devices are very restrict. While among observation, it’s hard to be observed and abound with disadvantages. With continuous optimization and careful operation, super-high accuracy of 0.3 mm within 400 m circumference was achieved and slab’s periodic movement could be seen through 3 times measurement.