Abstract:
The BEPCⅡ project started in summer of 2001 and has passed the National Acceptance Test in July 2009, which is for upgrading the Beijing Electron Positron Collider to reach a higher luminosity and keep its leading position among the same kind of facilities in the world. The BEPCⅡ control system has been rebuilt which adopted the distribution architecture, and developed with the EPICS (Experimental Physics and Industrial Control System). The BEPCⅡ control system was put into operation in November 2006. Till now it runs well and has reached the design goal. This paper describes the new BEPCⅡ control system.