秦山核电二期扩建工程废液排放系统的排放阈值分析

Analysis of Discharge Activity Thresholds of Liquid Waste Discharge System for Qinshan Nuclear Power Plant PhaseⅡ Extension Project

  • 摘要: 分析了核岛废液排放系统(TER)和常规岛废液排放系统(SEL)的废液排放在线监测阈值和槽式排放活度浓度,论述了废液排放系统的放射性总量控制和废液排放浓度的再线监测要求,最终分析确定了秦山核电二期扩建工程的废液排放浓度指标。

     

    Abstract: On line monitoring thresholds of liquid waste discharge and activity concentration of storage tank discharge of nuclear island liquid waste discharge system and conventional island liquid waste discharge system were analyzed. Total radiation dose control of liquid waste discharge system and on line monitoring demand of liquid waste discharge concentration were described. Finally, the target of liquid waste discharge concentration for Qinshan Nuclear Power Plant PhaseⅡ extension project was determined.

     

/