Abstract:
It is necessary to set up real-time hardware-in-loop simulation system for power regulation of nuclear heating reactor (NHR) because it is used in the load following instance such as seawater desalination and energy source. As the experiment data are so large that it is hard to be real-time all in one computer and to save and show the data. With the distributed configuration, the system was set up having a legible and intuitionist man-machine interface, speeding the model calculation computer and meeting the requirements of power regulation of NHR. Screen clear and concise, easy command input and results output make the system easier to verify.