  • 摘要: 核电厂高能管道应用破前漏(LBB)技术可提高其安全性与经济性,同时对材料提出了新的力学性能测试要求。文章研究和分析了美国核管理委员会颁布的LBB有关的标准评审大纲和实施规范等,梳理和归纳了测试项目、对象、温度、数量与热老化效应等5项总体要求,以及试样尺寸、侧槽效应、应变范围、试样方向等4项测试关键技术要求,以确保测试数据的有效性。本研究可为国内开展此领域的测试工作提供一定的指引作用。

     

    Abstract: The application of leak-before-break (LBB) technology on nuclear power plant high-energy piping systems can improve their safety and economy, while propose some new requirements on testing material properties. The U.S. Nuclear Regulatory Commission’s LBB related standard review plan and implementation specifications were analyzed, and test items, object, temperature, quantity and thermal aging effect of five general requirements were summarized. In addition, four key testing technical requirements, such as specimen size, side grooves, strain range and the orientation of specimens were also discussed to ensure the test data usefulness, representativeness and integrity. This study can provide some guidance for the aforementioned test program on domestic materials.

     

/

返回文章
返回