田湾核电站1号机组第6循环堆芯装载策略及验证

In-core Loading Scheme and Verification of Tianwan Nuclear Power Station Unit 1 Cycle 6

  • 摘要: 田湾核电站1号机组第5次换料大修期间,根据燃料组件检查结果,开展了紧急换料设计。1号机组第6循环堆芯装载策略具有不同于正常换料的特点,例如燃料装载不对称、部分辐照过的燃料组件移动到对称象限、堆芯功率分布不对称等。另外,堆芯装载策略考虑了TVS-2M先导燃料组件的位置要求。经第6循环寿期初物理试验和堆内测量系统验证,堆芯装载方案设计结果满足各项测量准则要求,且堆芯运行参数符合设计预期。

     

    Abstract: During the 5th refueling outage of Tianwan Nuclear Power Station Unit 1, according to the fuel assembly inspection results, emergency refueling design has been carried out. The in-core loading scheme of Unit 1 Cycle 6 has special characteristics from normal refueling. For example, fuel loading is asymmetry, some burned fuel assemblies are moved to symmetrical sectors, and in-core power distribution is asymmetry etc. In addition, in-core loading scheme has been considered the requirement on positions of TVS-2M pilot fuel assemblies. Verified by physics tests and in-core measurement system at beginning of cycle 6, design results of in-core loading pattern meet all measurement criteria and requirements, and in-core operation conditions conform to design anticipate.

     

/

返回文章
返回