Abstract:
To improve the economic efficiency, TVS-2M fuel assembly was considered to apply in Tianwan Nuclear Power Plant units 3, 4. Using KASKAD program package, a preliminary research and design was carried out for the Tianwan Nuclear Power Plant loading TVS-2M fuel assembly from the first cycle to equilibrium cycle. An improved fuel management program was obtained, and the economic analysis of the two fuel management programs with or without TVS-2M assembly was studied. The analysis results show that TVS-2M fuel assembly can improve the economic efficiency of the plant remarkably.