田湾核电站TVS-2M先导组件堆芯热工水力分析

Thermal-hydraulic Analysis for TVS-2M Type Pilot Fuel Assembly at Tianwan NPS

  • 摘要: 田湾核电站一号机组于第5燃料循环装入6组TVS-2M先导燃料组件,并将经历从第5燃料循环到第8燃料循环4年的堆内运行。本文通过对先导燃料组件堆芯热工水力分析,堆芯运行实际试验测量以及组件变形检查,验证了热工水力设计程序计算模型的合理性以及计算结果与试验结果的符合性。结果表明,TVS-2M燃料组件与AFA燃料组件具有良好的相容性,从而证实了过渡循环条件下反应堆运行的安全性和可靠性。

     

    Abstract: Six TVS-2M type pilot fuel assemblies were loaded starting from the 5th fuel cycle at Tianwan NPS Unit 1, and would be under 4-year in-core fuel operation lifetime test from the 5th cycle to the 8th fuel cycle. Based on in-core thermal-hydraulic analysis, as well as the thermal-hydraulic test measurement and fuel assembly deformation inspection for the TVS-2M type pilot fuel assemblies, it is verified that the calculation mode of the thermal-hydraulic design code is reasonable and the calculation results are in good agreement with test results. The results show that the TVS-2M type fuel assembly and the AFA fuel assembly have a good compatibility during reactor operation, and the core operation reliability and safety can also be ensured during the transition fuel cycles.

     

/

返回文章
返回