蒸汽发生器管板孔桥超差情况下的结构安全性分析

Structural Safety Analysis on Tube Sheet With Deviated Holes in Steam Generator

  • 摘要: 蒸汽发生器制造过程中对管板进行深孔钻时,发生管板孔桥超差。管板二次侧的3个管孔C165-R59、C167-R59、C168-R58不能满足设计要求,管板一次侧的这些管孔满足设计要求。针对该不符合项,核审评单位联合蒸汽发生器制造单位和设计单位,从管板的强度、管板孔桥超差不符合项对流致振动的影响、堵管后的传热管应力分析、传热管堵管的压差对孔桥强度的影响、孔桥超差导致的传热管接触磨损等角度进行了结构安全性分析。分析结果表明,目前的堵管方案合理可行,但需加强在役阶段的跟踪检查,以保证修复的可靠性和质量。

     

    Abstract: During the manufacturing process of the steam generator, deviated holes were detected when drilling the tube sheet. The sizes of three holes including C165-R59, C167-R59 and C168-R58 on the secondary side of the tube sheet don’t meet the design requirements, while the sizes and positions of those holes on the primary side are within design requirements. The structural safety analyses, including tube sheet strength, influence of tube sheet with deviated holes on flow induced vibration (FIV), stress analysis of plugged tubes, influence of the differential pressure between the plugged tubes and the unplugged tubes on the strength, and fretting wear between tubes caused by deviated holes, were done by the nuclear safety reviewer combined with the manufacturer and the designer. The results show that the repair plan is reasonable and feasibility. Meanwhile, in-service follow-up inspections must be strengthened to insure the quality and reliability of plugged tubes.

     

/

返回文章
返回