  • 摘要: 在反应堆工程设计上,第二燃料循环堆芯燃料管理设计的限制较多,设计困难较大,在很大程度上制约了电厂经营管理者对燃料循环长度的要求。通过对中核运行秦二厂第二燃料循环堆芯燃料管理策略的不断优化和改进,在其4台机组满足安全限值的要求下,实现了电厂年度换料的经营管理要求,提高了燃料使用效率和电站的经济性。对秦二厂第二燃料循环堆芯燃料管理策略改进的成功实践可为其他电厂提供借鉴。

     

    Abstract: In the construction design of nuclear power plant, there is too much restriction in the reloading pattern of the second cycle, and it is difficult to satisfy the requirement of fuel cycle length. The fuel management strategy of the second cycle in Qinshan project Ⅱ was modified and improved continually. The objective of annual operation in its 4 units was accomplished, and the fuel management and plant economy were increased. The experience is much helpful and could be implemented on the same type plants.

     

/