Abstract:
Since the DCS technology were introduced into the nuclear power plant, new challenges also have been brought into the full scope simulator development. The advantages and disadvantages of the most popular simulated solutions of the nuclear power plant DCS were compared and analyzed in this paper. The speciality of the nuclear power plant was also taken into account the analysis. In the end the optimized DCS simulation solution was recommended according to the analysis and the different situation of the nuclear power plant.