核安全级数字化仪控系统应用软件验证和确认方法研究及实践

Research and Practice of Application Software Verification and Validation for Nuclear Safety Digital I&C System

  • 摘要: 应用软件验证和确认(V&V)活动可验证应用软件开发过程中每一阶段的输出成果是否与该阶段的任务需求相符合,且确认最终生成的应用软件和系统是否与其预期的用途及相关需求一致。本文根据应用软件的特点,提出一套合理可行的应用软件V&V工作流程方法,并以某核电厂堆芯测量系统(RIC)改造项目中应用软件的V&V对其进行了检验。

     

    Abstract: Application software V&V activities determine whether the output results are consistent with the requirements of tasks throughout each stage of application software development process, and confirm whether the ultimately generated application software is conform to its intended use and other related requirements. A set of reasonable and feasible workflow for application software V&V activities was proposed based on the characteristics of the application software in this paper, and was demonstrated with the application software V&V activities in transformation project of in-core instrumentation system (RIC) in a nuclear power plant.

     

/