田湾核电站3、4号机组的长周期燃料管理

Long Cycle Fuel Management for TNPS Units 3 & 4

  • 摘要: 田湾核电站3、4号机组计划从首循环起使用TVS-2M组件,采用由年换料过渡到长周期换料的燃料管理方案,并且业主对平衡循环长度提出了更高的要求,目标是510 EFPD。本文使用KASKAD程序包,对从年换料快速过渡到长周期换料展开研究,并给出了两个燃料管理方案。对方案中堆芯的安全参数及其他重要参数进行了分析,并对平衡循环的经济性作了简单的分析评价。结果显示,2个燃料管理方案的安全参数均满足设计要求。该研究成果具有工程应用价值,可应用在田湾核电站3、4号机组和VVER-1000堆型中,提高电站经济性。

     

    Abstract: TNPS units 3 & 4 loaded TVS-2M fuel assemblies from the first cycle with transiting from year fuel cycle to long fuel cycle. The owners have advanced further requirement about the length of cycle with 510 EFPD. Using KASKAD program package, the research on quick transition from year fuel cycle to long fuel cycle were carried out, and two long cycle fuel management cases were obtained. The important parameters of the two cases were analyzed, and all of the safety parameters meet the design requirements. The simple economic analysis of the equilibrium cycle was made also in this paper. The results of the research have engineering application value and can be applied in TNPS units 3 & 4 and VVER-1000, and can improve the economic efficiency of the plant.

     

/

返回文章
返回