Abstract:
Dry-conversion UF
6 contains trace MoF
6, VF
5, and TiF
4, whose volatilities are close to that of UF
6, making deep purification difficult. Previous studies focused on phase-equilibrium and operating data, but continuous two-column coupling and sequence comparisons under consistent constraints remain insufficiently studied. Based on these, in this paper two-column UF
6 distillation sequences under unified separation constraints were compared and optimized. Vapor-pressure and vapor-liquid-equilibrium data were correlated to establish an NRTL model for the UF
6-MoF
6-VF
5-TiF
4 system. The results show that the Redlich-Kister area-test deviations for the UF
6-MoF
6 and UF
6-VF
5 systems remain below 10%. Two Aspen Plus configurations, light-impurity removal followed by heavy-impurity removal and the reverse sequence, were evaluated at identical column-top pressures, overall uranium recovery, and product impurity limits. The comparison included condenser and reboiler duties, specific thermal duty, column-volume indicator, total pressure drop, and economic costs. Four representative cost-type indicators were normalized against the light-first sequence to construct a composite performance index (CPI), with weight sensitivity assessed. The results show that both sequences achieve 99% uranium recovery and satisfy the product specifications. Relative to the light-first sequence, the heavy-first sequence reduces the combined condenser and reboiler duty by 6.9%, the column-volume indicator by 14.9%, and the total pressure drop by 6.3%, whereas total annual cost decreases by only 0.37%. Its equal-weight CPI is 0.930, corresponding to a composite penalty reduction of approximately 7.0%. As all four normalized indicators are below unity, positive weight variations do not reverse the ranking. UF
6 is the intermediate-volatility target, whereas trace TiF
4 removal requires substantially fewer stages and a much lower reflux ratio than deep MoF
6 and VF
5 removal. Under the investigated feed composition and uranium-loss allocation, the heavy-first sequence prevents TiF
4 from entering the difficult light-impurity column, thereby reducing thermal and hydraulic burdens. Sensitivity analysis identifies recomended theoretical-stage numbers of 5 and 23, feed stages of 3 and 10, and column-top pressures of 410 kPa and 400 kPa for the heavy- and light-impurity columns, respectively. An equipment-level refined model incorporating HeatX units, utility conditions, and principal equipment parameters was established to verify engineering implementability. At a UF
6 product flow rate of 73.18 kg/h, the calculated duties correspond to 1.70 m
3/h of cooling water and 15.5 kg/h of steam, equivalent to 0.023 m
3/kg and 0.212 kg/kg of product. The combined thermal duty predicted by this model is 0.273 kW·h/kg, 15.6% higher than the sequence-comparison value of 0.237 kW·h/kg but within the same order of magnitude. The model therefore provides a conservative basis for utility design and completes the analysis framework from unified sequence comparison and parameter optimization to equipment-level engineering verification.